Innob Services
Colocation

Your hardware, in the right building

We do not own a datacenter. We source rack space on request in a facility that fits your hardware and your data, check the power, carriers and remote-hands terms before you sign, and manage the hardware once it is racked, as we already do for clients today.

You already own the hardware.What you need is the building

Colocation is the least abstract product in this catalogue. You own the servers. What you are buying is floor space, power that does not fail, cooling that keeps up, network diversity, physical security, and someone who will walk to your rack and reseat a drive when it matters.

That makes it the easiest service to evaluate honestly and the hardest to fake. Power density per rack, whether the A and B feeds are genuinely independent all the way back, which carriers are actually present in the facility, how fast remote hands respond and what it costs: these are specific, checkable facts, and they differ from one building to the next.

We do not operate a facility of our own and will not pretend to. We source the space on your request, get those facts from the operator in writing before you sign, and then manage the hardware in the rack, which is work we already do for clients. You get one counterpart for the building and the machines in it.

Facility facts in writing

Power per rack, feed diversity, carriers present and remote-hands terms confirmed with the operator before you sign.

Carrier choice, not captivity

Cross-connects to the carriers present in the facility, so transit is a market rather than a single quote.

Managed once racked

We run the hardware and coordinate the facility's remote hands when something needs a person on site.

The pipeline, end to end

What taking over an estate actually moves through, and what has to be true at each boundary before the next stage can start.

  1. 01

    Read

    Read-only access. Every host, service, dependency, certificate and credential inventoried, with the patch state of all of it.

    in
    An estate nobody documented
    out
    An accurate inventory
  2. 02

    Rank

    The inventory becomes a list ranked by consequence, not by how easy each item is to fix.

    in
    An accurate inventory
    out
    A ranked risk plan
  3. 03

    Instrument

    Monitoring goes in before remediation, so there is a baseline to compare against once things start changing.

    in
    A ranked risk plan
    out
    A measured baseline
  4. 04

    Operate

    Operational responsibility transfers with the SLA live and the escalation ladder tested by a real page.

    in
    A measured baseline
    out
    An estate somebody owns
  5. What monitoring catches, and what each incident review finds, feeds the next change window and the next capacity plan

What's included.

Space, power, network and hands, sourced to fit. Priced per rack, per feed, per connection.

Quarter to Full Rack

Space from a quarter rack to full cabinets, with the power allowance per rack stated in the quote.

Redundant Power, Checked

A and B feeds confirmed with the operator, including where they run and whether they merge upstream.

Cross-Connects

Connections to the carriers and peers present in the facility, so transit stays competitive.

Remote Hands, Coordinated

The facility's on-site engineers for reseats, swaps and console access, dispatched and followed up by ours.

Physical Security

Facilities with logged entry, per-person authorisation and locked cabinets, checked before they reach the shortlist.

Hardware Monitoring

The racked hardware watched like the rest of your estate, with power and temperature where the facility exposes them.

What is in, and what is not.

Scope disputes are the most common way a managed engagement goes wrong, and they are almost always caused by something nobody wrote down. So here is the boundary, before you ask for it.

Included

  • Sourcing rack space on request, from a quarter rack to full cabinets, with the power allowance stated
  • Facility checks before you sign: power per rack, feed diversity, carriers present, remote-hands terms
  • Cross-connects to the carriers and peers present in the facility
  • Coordination of the facility's remote hands for reseats, swaps and console access
  • Monitoring of the racked hardware, with power and temperature where the facility exposes them
  • A plan for the physical move, not just the destination

Not included

  • Your hardware itself, its warranty and its spares
  • Operating system and application management, unless taken as separate modules
  • Unlimited remote hands. The facility's allowance and rates are in the quote, and project work is quoted separately
  • A facility of our own. We source and manage; the operator runs the building

Who this is for.

Who colocates, and why.

  • Enterprise IT

    Exiting an office comms room

    Hardware moved out of a server cupboard with domestic power into a facility built for it.

  • Capex-heavy workloads

    Hardware already owned

    Existing kit with years of life left, needing a building rather than a replacement.

  • Regulated

    Physical custody

    A documented chain of physical access and control over specific hardware.

  • Network operators

    Carrier density

    Presence in a facility where the peers and carriers you need already are.

  • High-density compute

    Power and cooling

    GPU and compute density that an office environment cannot power or cool.

  • Disaster recovery

    Second site

    A geographically separate location for standby capacity and off-site copies.

Checked

Power feeds

Feed diversity confirmed with the operator before you sign.

Multi

Carrier

Cross-connect choice instead of a single transit quote.

On site

Remote hands

Response time and rates in the quote, not discovered during an outage.

Logged

Physical access

Per-person authorisation with an auditable entry record.

How we work.

How a migration into the rack runs.

  1. 1

    Audit

    We inventory what exists: hosts, services, dependencies, certificates, access, and the patch state of everything. Most of this has never been written down, and writing it down is the first deliverable.

  2. 2

    Risk triage

    We rank what we found by how badly it can hurt you. Exposed services, expiring certificates and unpatched kernels get addressed before anything cosmetic.

  3. 3

    Instrument

    Monitoring, alerting and escalation go in next, so from this point forward we find out before your customers do.

  4. 4

    Document

    Runbooks, architecture and change procedures written so the knowledge belongs to the service rather than to one engineer.

  5. 5

    Transition

    We take operational responsibility formally, with the SLA active and escalation paths tested rather than assumed.

  6. 6

    Operate

    Monitoring, patching on schedule, incident response, and capacity review. This is the steady state the rest of it exists to reach.

  7. 7

    Advise

    Ongoing review of your roadmap against the platform, so planned changes are assessed before they are made.

What we run it on.

Chosen per workload rather than by policy. Where a simpler tool is the right answer, we say so.

Power

  • A+B feeds
  • UPS
  • Generator
  • Per-rack metering

Network

  • Redundant uplinks
  • Cross-connects
  • Private peering
  • BGP

Monitoring

  • Power draw
  • Temperature
  • Humidity
  • Door access

Sectors

SaaS, Fintech, Healthcare, E-commerce, Public sector, Logistics, Media

What this looks like in your market.

The constraints differ by region, and so does the first question a buyer asks.

United Kingdom and EU

Buyers here are usually experienced and will ask about facility operator, power density per rack, carrier list and remote-hands response before they ask about price. We get those numbers from the operator before the shortlist reaches you, because an evasive answer ends the conversation, correctly.

Gulf states

In-country colocation is often driven by regulation rather than latency, and the practical constraints are access procedures and customs for hardware imports. Both are worth planning for before the migration date is set.

United States and Canada

The common trigger is a company moving hardware out of an office comms room with domestic power and no cooling. That migration has a physical plan, not just a technical one, and we scope the move itself rather than only the destination.

Do not buy this if

  • Anyone who wants us to supply and own the hardware. That is dedicated servers
  • Workloads better served by cloud. If you are colocating because it feels cheaper, do the comparison properly first and include your own staff time
  • Teams needing frequent unscheduled physical access. Facility access carries notice periods we do not control

We would rather lose the engagement at this paragraph than at month four. If one of these describes you, say so on the first call and we will tell you honestly whether there is a version of this that works.

How this is priced.

Monthly per rack unit or cabinet, plus power, plus cross-connects, with our management of the hardware as its own line.

What moves the number

  • Space taken, from a quarter rack to full cabinets
  • Power draw, which is usually the real constraint rather than space
  • Number of cross-connects, each typically a recurring charge
  • Remote hands allowance beyond the included hours

Power is the line that surprises people. A rack sold by units but capped on kilowatts cannot be filled, so we quote power explicitly rather than leaving it in the footnotes.

The questions you were going to ask anyway.

Including the ones that are uncomfortable for us. A supplier who has not thought about why you might say no has not thought about the engagement.

Which facilities, exactly?

The one we source for you, named in the quote with city and operator before anything is signed. We do not own a datacenter and will not describe one; we find space that fits your hardware, your data and your carriers, and we manage colocated hardware for clients today. The same goes for power density per rack and for which carriers will actually sell you a port in that building rather than being technically present: you get the operator's answer in writing.

Is the A and B power genuinely independent?

We ask the operator where the paths run and whether they merge anywhere upstream, because in some buildings they do, and pass the answer on as given. A provider who answers this question with the word redundant and nothing else is hoping you will not ask the follow-up. Diversity that fails together is worse than a single path honestly described, because you would have budgeted differently.

What does remote hands actually cost during an outage?

It is stated in the quote: the facility's included allowance and its rate for work beyond it. The common failure in this market is an unstated price discovered during an incident, which is the worst possible moment to find out. Ours is on the order form.

Commitments, written into the contract

Not reassurances. Each of these is a term you can point at during an incident, and each answers a question buyers ask before handing over production.

Who holds root on your database today. How fast a critical patch actually lands. What happens to an engineer's access the day they leave. Whether anyone has ever restored from the backup. Those are the questions that decide whether your infrastructure is safe, and every one of them is answered in writing before you sign.

Who can reach our systems?

Named access, revoked on the day

Every engineer works under a named account with least-privilege access. There is no shared root password and no generic ops login. When someone leaves the team or rolls off your account, their access is revoked the same day and the revocation is logged. You can ask for the current access list at any time and you will get it the same day, not after a review cycle.

What did you do to our systems, and when?

A change record for every change

Nothing is changed on your infrastructure without a record: what changed, who approved it, when it was applied, what the rollback was, and whether the rollback was tested. Emergency changes follow the same record, written after the fact rather than skipped. The log is yours to read whenever you want it, and it is the first thing we hand an auditor on your behalf.

How fast do you actually apply security updates?

Patch windows agreed in advance

Routine security updates land in a standing window you agreed when the account was set up, on a cadence written into the SLA. Critical-severity vulnerabilities are expedited outside that window, and you are told before we act rather than after. We publish the cadence rather than describing patching as continuous, because continuous is not a number anyone can be held to.

Do the backups actually work?

Restores tested, not assumed

A backup that has never been restored is a hypothesis. We test-restore on a schedule and record the result, including how long the restore took, because recovery time is the number that matters during an incident and almost nobody measures it in advance. If a restore fails we tell you that week, not at the next review.

Questions we get asked.

Which facilities do you have space in?

None of our own. We source the space on your request, in a facility chosen with you for location, power and carriers, and the quote names it with city and operator before anything is signed.

What power density per rack?

What the facility can deliver and your hardware needs, confirmed in kW per rack with the operator and written into the quote. A rack sold by U but capped on power is the most common colocation disappointment, so it is the first thing we check.

Is the A+B power genuinely independent?

We ask the operator where the feeds run and whether they merge upstream, and pass the answer on as given. If they merge somewhere, you will know where before you sign. A buyer who finds out later will not forgive it.

How does remote hands work?

The facility's on-site engineers do the physical work, dispatched and followed up by ours, who handle everything from the operating system up remotely. Their response time, what is included and what is billed per incident are in the quote. The common failure is an unstated price discovered during an outage.

How do we get physical access?

Through the facility's own process. Per-person authorisation with logged entry is the model, and the notice period varies by building, so we tell you both before you sign and arrange access when you need it.

Are cross-connects charged separately?

Usually, yes: most facilities charge each one monthly. Every cross-connect you need is listed in the quote with its recurring charge, because undisclosed recurring fees reshape the economics after signing, and buyers remember.

Can you manage the hardware too?

Yes, colocation and server management are separate modules and combine cleanly. Plenty of clients rack their own hardware and hand us the operating system and everything above it.

Get your hardware into a real building.

Tell us what you are running and where it sits now. We will find the space, check the power and plan the move.

Incident 4471Closed in 17 min
  1. 02:14Detected

    Disk latency above threshold on postgres-primary

  2. 02:15Acked

    Paged on-call, runbook DB-04 opened

  3. 02:31Resolved

    Failed over to replica, write path restored

Handled by
DORM
What would you take over first?